Building an Early Childhood Center in NYC

Early childhood centers in New York City often move into old buildings, sometimes on landmarked blocks, and remake them for the youngest students. Independent and early-childhood schools are one of the sectors we build for, and 15+ of our projects are schools. Two of them, both in Brooklyn, show what preschool construction in this city usually involves: Packer’s Early Learning Center, rebuilt structurally behind its landmarked façade, and the Montessori School in Brooklyn Heights, which grew by joining a former firehouse to its main building.
This article is about what is particular to an early learning center. How to choose a contractor for a school, and how school work fits into a summer break, are covered in how to choose a school construction contractor and renovating a school over the summer.
The city’s requirements for child care
A child care center in New York City needs a permit from the city’s Health Department, on top of the usual building permits, and the permit relies on a Certificate of Occupancy from the Department of Buildings confirming that the space meets the physical requirements for child care. Programs for infants and toddlers, for children aged two to five, and night care each need their own permit, and preschool classes run as part of a school fall under a separate set of the Health Department’s rules. These rules affect the layout as well as the paperwork, so they are best confirmed while the design is still open, with the school, its architect and its consultants.
Two practical points follow from that:
- Design to the requirements, not around them. The rules cover floor space for each child, toilets, hand washing and diaper changing, and outdoor play areas and their fencing, among other things. All of them are easier to plan in than to fix later.
- Leave time before opening. A center can’t open without its permit, and the permit can’t be issued without the building’s Certificate of Occupancy. The construction schedule should end early enough for both.
A building at a child’s height
An early learning center is full of things built for small people: cubbies, low shelving and casework, sinks and counters at a child’s height. Much of it is millwork. Our millwork shop in Greenpoint makes classroom casework and custom built-ins, with finish samples and mockups so teachers and the architect can see a piece at full size before it is made. Our steel shop makes stairs and railings.
Rebuilding behind a landmarked front: Packer
At Packer’s Early Learning Center, with James Wagman Architect, the building was completely structurally replaced while its landmarked façade stayed intact. Inside, every mechanical system and every finish was replaced. Completed in 2019, the center is a new building behind a historic front.
The project began with a comprehensive structural analysis and a plan to keep the façade in place, before any demolition. For an early learning center, a full replacement like this has a clear advantage: the systems are new throughout, and the rooms can be laid out for young children rather than fitted into an old plan. We worked closely with the school throughout and gave it regular updates. More on rebuilding behind a protected façade in renovating landmark and historic buildings.
Joining a firehouse to a school: Montessori
A firehouse was built for engines and crews, not for small children. At the Montessori School, with MBB Architects, the school grew by connecting a former firehouse to its main building, and before the firehouse could take classes it needed underpinning, new columns and beams, new slabs and a new stair. The school’s own building followed in a second phase, with three floors renovated over a summer break. The project, 19,500 square feet in all, was completed within its construction schedule in 2013.
Converting a building from another use is common for early childhood programs, and it brings the structure, the stairs and the city’s requirements into the design from the first sketch. We describe the project’s Brooklyn Heights setting in brownstone renovation in Brooklyn Heights.
Questions for an early childhood project
- How many children, of what ages, and in what kind of program?
- Which city requirements for child care apply, and who confirms them?
- Is the building landmarked, and what has to stay?
- Which parts of the building stay in use during the work?
- What has to be ready, inspected and signed off before opening day?
Starting an early childhood project with us
Send us the address, the current drawings or a short description of the program. We will look at the building, the phasing and the schedule to opening. See our educational projects and our work as a general contractor in Brooklyn and in Manhattan, or call (718) 599-0031.